Dotted lines show front half of Smile plot – May 2003 |

Project Manager Berat (right) overseeing the laying of the foundations begun in
September 2003 |

Local builders and craftsmen were employed for
the construction
|

Wooden shuttering in place for concreting of
flooring and triangular balconies |

Site Foreman, Builder, Phil Beckwith and Clive give their approval
of the work done so far |

Gordon Carr (centre) helping with the block work
Gordon Carr and Phil Beckwith have used their
building expertise to advise and check progress throughout the construction |

Rev Graham Thomson
led the first communion service in the basement,
with the team in October 2003, while the building work continued above |

Front view showing terrace and vehicle/aid
storage basement beneath |

Smile volunteers Beth, Mike, Claire and Diana who, along with other helpers,
decorated the Centre during summer 2004 |

The Smile Centre (arrowed) on the hill on
outskirts of Gjakove |

Thermal cladding applies and
exterior painted |

Kitchen
|

Time of fellowship for the
summer team in the lounge |

Lounge
|

The Vic Ramsey Theological Library, which will
provide study materials and resources for pastors, students and visitors |

Construction of driveway between plot and the
road to Gjakove |

Hard standing construction |

Building perimeter wall
|

Walls, driveway and gates completed |

The Centre in full operation with minibuses and ambulances |